I had been working within the Manufacturing Technology team on site and was studying the Pareto of top ten production losses due to equipment failures.

Within the top ten was a critical centrifugal pump that had contributed to 88 hours lost production over the previous 16 months.

Operating Context:

The pump was required to operate 24/7, however, it was not continually pumping to production but was required to run through a kickback line. The nature of the product being pumped meant steam jacketed pipework was required to keep the product in solution.

A design change had been implemented the previous year which included a new 3 way valve which allowed switch over from production flow to kickback using automated control. A new design double cartridge seal was also installed on the pump complete with steam flush.

 

Key Findings:

I first facilitated RCA in 1997 and became an accredited global trainer. At PRS, we support 5 Whys, Causal Factor, and Apollo methodologies. Contact us for RCA support or training.

Equipment Reliability
Breaking Records Together – Operational and Reliability Excellence
Learn more
Maintenance Strategy
Development of Maintenance Strategies for Food Grade Oil Facility
Learn more
Root Cause
My First RCA
Learn more

Price Based Country test mode enabled for testing United Kingdom (UK). You should do tests on private browsing mode. Browse in private with Firefox, Chrome and Safari